Posted by: transdomo | March 1, 2010

juwi Group developing its first U.S. wind farm

German renewable energy company juwi Group is developing its first U.S. wind farm. Construction on the 60 MW Flat Water Wind Farm in Richardson County, Neb., has started, and the project is expected to be complete in 2011.
The project is being developed by the juwi Group, through its J.W. Prairie Wind Power LLC, located in Lawrence, Kan. A 20-year power purchase agreement was concluded with Omaha Public Power District.
The project is being constructed by Gallop Power LLC, which acquired the Flat Water Wind Farm from J.W. Prairie Wind Power.
It is anticipated that juwi will perform the technical and commercial management of the Flat Water Wind Farm for Gallop.
The Flat Water wind farm will consist of 40 GE 1.5 MW wind turbines and is expected to produce about 220 million kWh of electricity annually.
Press Release

Posted by:
TransDomo, LLC
Klaus Westerwelle
8 Briarpark Drive
Greer, SC 29651
Phone: 864.908.0690
Email: info@transdomo.com
International Business Consulting: Transdomo
International Real Estate / Immobilien : Westerwelle


Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Categories

%d bloggers like this: